University of Kentucky - Football Training and Practice

20160812_104022.jpg

98,000 Square Feet Project Size

This new 98,000 square foot facility is adjacent to The New Commonwealth Stadium and connected to the existing Nutter Indoor Training Center. It includes state-of-the-art dining facilities, strength and conditioning areas, hot and cold plunge pools, a player auditorium, a weight room, players' lounge and athletic training spaces.  The facility serves as a game-day locker room.

20160812_105726.jpg

$45M Project Cost

This facility is conditioned with variable air volume (VAV) central air handlers and VAV terminal units with hot water reheat. The video production and communication rooms are conditioned with a variable refrigerant volume (VRV) systems. This allows the central systems to be shut down to save money while critical heat producing rooms can still be kept cool.

20160812_104525.jpg
20160812_104905.jpg
UK Football Training Facility (2).JPG