Pick a portfolio category

The Main Building (The Administration Building) Renovation

Location

Lexington, Kentucky

Description

This project consisted of the renovation of the existing Administration (Main) Building.  The existing building interior was gutted and the exterior shell saved.  Two new chilled and hot water variable air volume systems were installed.  The utilities were fed thru a new tunnel from the Patterson Office Tower Building.  A new electrical room was added, off the tunnel, for electrical switchgear.  The emergency power was fed from the existing Patterson Office Tower emergency generator.  In addition, hot and chilled water piping were fed from the new tunnel to serve the Gillis Building.